Singapore markets open in 4 hours 45 minutes

MUX Nov 2024 8.000 call

OPR - OPR Delayed price. Currency in USD
Add to watchlist
3.75000.0000 (0.00%)
As of 09:33AM EDT. Market open.
Full screen
Previous close3.7500
Open3.7500
Bid2.2000
Ask4.4000
Strike8.00
Expiry date2024-11-15
Day's range3.7500 - 3.7500
Contract rangeN/A
Volume2
Open interest27
  • GlobeNewswire

    McEwen Mining Announces Flow-Through Financing at $14.36 (Cdn$19.59) per Share a 19% Premium to Market

    CANADIAN BASE SHELF PROSPECTUS IS ACCESSIBLE, AND PROSPECTUS SUPPLEMENT WILL BE ACCESSIBLE ON SEDAR+ WITHIN TWO BUSINESS DAYS TORONTO, May 28, 2024 (GLOBE NEWSWIRE) -- McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) (“McEwen”) is pleased to announce it has priced a public financing to fund continued exploration and development at the Fox Complex in the Timmins region of Ontario, primarily focused on exploration drilling and the development of an underground access ramp from surface to mine the gold re

  • GlobeNewswire

    McEwen Mining: Grey Fox Exploration Update Extending the Production Pipeline: Good Grades Near Surface, Potential at Depth

    Assay Highlights:24GF-1426: 586.7 g/t Au over 0.5 m (18.86 oz/t Au over 1.6 ft)24GF-1424: 14.3 g/t Au over 5.0 m (0.46 oz/t Au over 16.4 ft)24GF-1397: 17.4 g/t Au over 4.2 m (0.56 oz/t Au over 13.8 ft)22GF-1366: 8.8 g/t Au over 3.9 m (0.28 oz/t Au over 12.8 ft)(See Figure 2. All assay values are true widths) TORONTO, May 27, 2024 (GLOBE NEWSWIRE) -- McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to provide new assay results from the Grey Fox deposit, part of our Fox Complex. The results in

  • GlobeNewswire

    McEwen Copper Announces Completion of the Feasibility Drilling Program

    70,000 meters completed, highlights include: 349.0 m of 0.77% Cu, including 232.0 m of 0.86% Cu (AZ23292) 382.5 m of 0.54% Cu, including 74.0 m of 0.86% Cu (AZ23277) TORONTO, May 16, 2024 (GLOBE NEWSWIRE) -- McEwen Copper Inc., 47.7% owned by McEwen Mining Inc. (NYSE: MUX) (TSX: MUX), is pleased to provide the assay results from the currently completed drill season at the Los Azules project in Argentina. The prime objectives of this season’s infill drilling campaign were: 1. to confirm the size