Advertisement
Singapore markets open in 4 hours 52 minutes
  • Straits Times Index

    3,332.80
    -10.55 (-0.32%)
     
  • S&P 500

    5,460.48
    -22.39 (-0.41%)
     
  • Dow

    39,118.86
    -45.24 (-0.12%)
     
  • Nasdaq

    17,732.60
    -126.10 (-0.71%)
     
  • Bitcoin USD

    61,942.95
    +989.55 (+1.62%)
     
  • CMC Crypto 200

    1,286.52
    +2.69 (+0.21%)
     
  • FTSE 100

    8,164.12
    -15.56 (-0.19%)
     
  • Gold

    2,336.90
    -2.70 (-0.12%)
     
  • Crude Oil

    81.46
    -0.08 (-0.10%)
     
  • 10-Yr Bond

    4.3430
    +0.0550 (+1.28%)
     
  • Nikkei

    39,583.08
    +241.58 (+0.61%)
     
  • Hang Seng

    17,718.61
    +2.11 (+0.01%)
     
  • FTSE Bursa Malaysia

    1,590.09
    +5.15 (+0.32%)
     
  • Jakarta Composite Index

    7,063.58
    -6,967.95 (-49.66%)
     
  • PSE Index

    6,411.91
    +21.33 (+0.33%)
     

Solid Power, Inc. (NASDAQ:SLDP) Q4 2023 Earnings Call Transcript

Solid Power, Inc. (NASDAQ:SLDP) Q4 2023 Earnings Call Transcript February 27, 2024

Solid Power, Inc. reports earnings inline with expectations. Reported EPS is $-0.11 EPS, expectations were $-0.11. Solid Power, Inc. isn’t one of the 30 most popular stocks among hedge funds at the end of the third quarter (see the details here).

Operator: Greetings. Welcome to the Solid Power Inc. Full Year 2023 Financial Results and Business Update Call. Please note that this conference is being recorded. I will now turn the conference over to your host, Jennifer Almquist, Investor Relations for Solid Power Inc. Thank you. You may begin.

Jennifer Almquist: Thank you, operator, and thank you, everyone, for joining us today. I'm joined on the call today by Solid Power's President and Chief Executive Officer, John Van Scoter, and Chief Financial Officer, Kevin Paprzycki. A copy of today's earnings release is available on the Investor Relations section of Solid Power's website at ir.solidpowerbattery.com. I'd like to remind you that parts of our discussion today will include forward-looking statements as defined by U.S. securities laws. These forward-looking statements are based on management's current expectations and assumptions about future events and are based on currently available information as to the outcome and timing of future events. Except as otherwise required by applicable law, Solid Power disclaims any duty to update any forward-looking statements to reflect future events or circumstances.

ADVERTISEMENT

For a discussion of the risks and uncertainties that could cause actual results to differ materially from those expressed in today's forward-looking statements, please see Solid Power's most recent filings with the Securities and Exchange Commission, which can be found on the company's website at ir.solidpowerbattery.com. With that, let me turn it over to John Van Scoter.

John Van Scoter: Thank you, Jen, and good afternoon, everyone. Thank you for joining the call today. I'll begin today with a brief overview of 2023 and our overall progress. Then I'll walk through our 2024 goals and priorities. After that, I'll hand off the call to Kevin for the financial review, and we'll open up the call for Q&A. 2023 was a milestone year for Solid Power. We successfully commissioned SP2, our second Solid Power facility to lead electrolyte production. We accelerated our cell development with a key partner and overcame significant yield challenges as we scale production, and we delivered our first EV cells to officially enter the automotive qualification process. Before I go further in detail on our progress, I want to give kudos to the Solid Power team and express my sincere appreciation for their hard work in hitting these milestones.

This was a challenging year, and the team did remarkable work to contribute to the business growth. I'll start with our progress on the electrolyte side. Since commissioning our SP2 plant in April, we've successfully phased out electrolyte production at SP1 and begun using SP2 electrolyte in our EV cells. We successfully ramped up our SP2 production, achieving an electrolyte production capability of 1.1 metric tons per month in multiple campaigns. This represents a tremendous increase in scale and a new best for the company. While this does fall just short of our original 2023 production goal, we were able to overcome a couple of unexpected challenges with equipment and incoming material quality that we saw late in the year. As we continue to work through these issues, we remain confident in scaling production of electrolyte in 2024.

During 2023, we also sampled our electrolyte to new potential customers with positive reception. To be clear, these are not companies we have a current joint development arrangement with. Several of these potential customers have engaged in numerous rounds of feedback as we continue to optimize our electrolyte for these customers' unique needs. We now have multiple potential customers that are testing our powders, comparing it with our competition and incorporating it into cell designs. This reinforces electrolyte as our core strategy, and I'm personally very excited about the great long-term opportunity this represents for our shareholders. Overall, it was a strong year for our powder team, pursuing market opportunities and continuing to improve production.

On the cell development side, we made significant advances in 2023 also. First, in regard to cell production. Manufacturing yields improved greatly, and we also increased the quality on our 20-amp hour builds. We translated these learnings from those cells to quickly begin manufacturing our EV cells. This progress was driven by close collaboration with BMW as well as the utilization of new equipment and improved processes. With the increase in production, we've also seen improvements in cell performance. While still early, initial testing on A1 samples demonstrates generally good performance with incremental steps forward in cycle life, low temperature performance, pressure and energy density goals. These learnings and continued testing will help to set guidelines and markers as we progress towards the performance targets required by A2 and A3 cells.

2023 cell development also presented us with challenges and unique learnings. As we've begun to scale up the size of our cells, safety performance has been varied. We are currently reviewing a small handful of cells that went into thermal runaway over the last couple of weeks. The team is heavily focused on root cause analysis as safety is an area where we hold ourselves to a high bar and believe we can excel over the long term. Preliminary findings point to inconsistent or contaminated input materials and small manufacturing defects. We remain proud of the improvements our cell team has been able to achieve in 2023. The team's efforts enable us to refine our EV cell production process, ramp manufacturing volumes and ultimately enter formal automotive qualification.

This solid execution underscores our confidence in overcoming our current challenges and those that lie ahead. Taking a step back more generally during 2023, Solid Power also successfully grew the business to a total of over 270 employees, including key hires in late fourth quarter for supply chain and communications and further strengthened our management team and Board with the addition of essential expertise. We also implemented new tools to support multiple areas of the business and increase efficiency, including SAP enterprise software, which has been fully adapted into our business processes. These are heavy lifts and I want to thank the team for carrying these projects forward across the finish line. These successes gave us a lot of positive momentum as we enter 2024, and we have some wins already this year.

In January, we announced a deepened relationship with SK On. We believe this new arrangement will enable us to collaborate more deeply on our cell development with a Tier 1 battery manufacturing partner, strengthen our competitive positioning by increasing our presence in Korea, demonstrate our capabilities as an electrolyte supplier with our first-ever electrolyte supply agreement and further strengthen our balance sheet over time. Importantly, once we have completed the tech transfer and Korea line installation in 2025, we will have enabled round-the-clock cell development capabilities using our technology on three lines across the U.S., Europe and Asia. Since announced in January, the team has been busy. Jack Al Ferzly has been promoted to Managing Director of our Korea operations.

Since joining Solid Power three years ago, Jack has been a key driver behind the success of many of our strategic and capital projects, including the installation of our EV line in SP1. We're in the process of rounding out the Korea team, and we'll be adding additional key hires very soon. We are acting with urgency and have already placed POs for equipment moved into our permanent offices, secured back-office support and are meeting with local government officials to ensure positive collaboration as our operations grow. We will provide more updates as we progress and look forward to working more closely with SK On in the years to come. We continue to feel confident in our development and strategic progress. This led us to announce a $50 million share buyback program in January to capitalize on what we see as our undervalued stock price.

Our ability to execute this program is a reflection of our strong liquidity position and our commitment to driving long-term shareholder value. Looking forward to 2024, the team has set four goals for Solid Power this year. These goals build upon our current successes and continue our move towards commercialization. Our goals for 2024 are, first, expand our electrolyte capabilities and available market; second, continue advancing our cell designs. Third, execute on partner commitments; and lastly, further strengthen our presence in Korea. Let me take a moment to walk through each of these. Our first 2024 goal is to expand our electrolyte capabilities and the available market for our powder. To do this, we intend to lean on three key strategies.

First, we plan to increase our production capability at SP2 to 30 metric tons per year or 2.5 metric tons per month. We've already made great strides to achieve a 1.1 metric ton per month run rate, and we'll use last year's optimizations to increase to 2.5 metric tons per month. This assumes the slight equipment modifications and improved quality of incoming material, as I mentioned previously. As we increase our volumes, we also intend to improve our manufacturing processes to drive greater consistency and performance. Second, to expand our sampling program. The team has done a great job getting samples out to six different potential customers with growing interest from battery manufacturers and auto OEMs. Building off this success in 2024, we're growing this program and are in the process of working with an additional 10 to 15 potential customers and kicking off sampling cycles with each of them.

A battery powered electric vehicle charging in a city storefront.
A battery powered electric vehicle charging in a city storefront.

We're excited about the opportunities these conversations open and are encouraged by the positive feedback we've gotten so far. Third, we will continue to develop our next generation of powders, which we believe will deliver improvements in connectivity, cost and performance. We're continuing to build and enhance the SP2 R&D lab, which we are targeting to complete mid-2024. This will help us optimize continuous electrolyte production, reduce the cost of our powder and develop future generations of even higher-performing electrolytes. Our second goal for 2024 is to continue advancing our cell designs. As we advance through the initial stages of automotive qualification, we are committed to further elevating our cell performance across the board, including cycle life, safety, low temperature performance, pressure and energy density.

The advancements we make in each cell stage will act as key learnings to incorporate as we advance our designs to A2 and A3 sample cells. Along with many scheduled upgrades, this iterative process will help us deliver incremental steps towards final A3 performance requirements. We're also not starting from scratch. We do not anticipate that A2 or A3 designs will require a full redesign of the batteries or major changes of the chemistry used in our electrolyte. We plan to shift our focus towards A2 cells in 2024 and this falls in line with our partners' commercialization time lines. The A2 focus will also help us meet partners' performance requirements, which are centered around higher energy density, longer battery life and lower cost compared with today's lithium ions.

Most importantly, as we continue to scale our cell size and progress through automotive qualification over the coming years, we believe our A2 cells will be a key step towards meeting our incredibly high safety standards. Our third 2024 goal is to continue to execute on our partner commitments. We have three unique and valued joint development partners each with their own pace, working style and immediate needs from Solid Power. Let me take them one at a time. First, BMW. Since deepening our relationship with BMW in 2022, we have successfully entered automotive qualification with A1 sample EV cells and delivered more than 200 of these cells to BMW. We will continue our strong collaboration in 2024 with BMW and look forward to supporting them as they build the world's first full-size demo sedan powered by Solid Power's solid-state battery.

We are working collaboratively with BMW to ensure that our A2 sample cell will meet their requirements for their demo car. Turning to SK On. Our deepen partnership in 2024 is incredibly encouraging, and we look forward to substantial collaboration alongside the SK On team. Under our recent agreements, we are committed to executing on our tech transfer commitments and beginning the process for the Korea line installation deliverables, including ordering equipment, integrating teams and responsibilities and beginning implementation. We'll also be laying the groundwork for future electrolyte deliveries supported by higher volume production. With Ford, we continue to execute on our joint development agreement and are committed to continuing execution at a high level for this valued partner.

We have shipped electrolyte to Ford and have received positive initial feedback. In 2024, we are both setting targets and exploring ways to collaborate even more closely as we continue to advance our technologies. Our fourth and final 2024 goal is to further strengthen our presence in Korea. We already have a great start here with the expanded SK On Agreement. Additionally, we're working to embed solid power in the Korea battery ecosystem through collaborations with local institutions, including government labs, top universities and public-private initiatives. These collaborations will enable us to build a stronger network in Korea with OEMs, battery manufacturers and materials and equipment providers while also keeping abreast of development trends, government incentives and new technologies.

We continue to believe that Solid Power stands to benefit immensely from the increased presence in this key battery market, and we look forward to sharing our progress as we continue to build our presence in Korea. Before I hand it over to Kevin, I also want to touch briefly on our external communications, which we highlighted as a priority in our calls last year. We remain committed to increasing high-quality interactions and greater visibility with our stakeholders. For 2024, I'm happy to share we are planning to roughly double our planned touch points with stakeholders, attending a mix of investor and industry conferences around the world. We also plan to evaluate and enhance our strategy for sharing important news and updates and explore the channels we'll use to distribute such as our website and social media in order to provide richer, more timely information about Solid Power, our people and our innovative technologies.

We look forward to providing you with better visibility into the incredible things happening here. With that, I'll hand it over to Kevin to take you through our financial results. Kevin?

Kevin Paprzycki : Thanks, John. Good afternoon, everyone. I'll start off today with an overview of our financial results and then discuss our '24 outlook. Our '23 financial results reflect strong execution by the team from our start-up of SP2 all the way through our entry into a sample. '23 revenue of $17.4 million fell right in the middle of our guidance range. This reflects solid performance on key milestones, partner commitments and government contracts. '23 operating expenses were $108 million, reflecting increased operational costs as we ramped both EV cell and electrolyte production over the year and increased R&D costs as we work to deliver our A1 sample cells. Our '23 operating loss was $90.6 million and net loss was $65.5 million or $0.37 per share.

Turning to our balance sheet and liquidity. During '23, we invested $58.3 million into operations and $34.5 million in the CapEx, bringing our total cash investment to $92.8 million. This was well below our guidance range. When we were able during the year, we prudently pushed expenditures into '24. All in, we deferred roughly $35 million, consisting of about $20 million in operational investments, mostly development materials and around $15 million in capital investments related to our R&D lab and other SP2 enhancements. As a result of our lower spend, we ended the year with total liquidity just under $416 million. Our ending liquidity includes $34.5 million in cash and equivalents that we keep on hand, but the bulk of this amount, around $381 million is invested and shows up in the marketable securities and long-term investment line items on our balance sheet.

All of those investments are in A rated securities. We plan to provide longer-term cash guidance later this year. However, at the moment, we continue to believe this strong liquidity position, combined with our capital-light business model, still gives us a cash runway into the late 2020s. Looking ahead to '24, we currently expect our '24 revenue to be in the range of $20 million to $25 million. This includes expected revenue from the SK On agreement we signed in January as well as the remaining revenue from our BMW group. Our '24 revenue from government contracts is expected to be lower than '23. This is a result of both successful completion of current contracts as well as us being more selective in the programs we pursue. We will still pursue government contracts when it makes sense to do so.

However, our focus is on delivering for our core customers. We're still firming up the timing of certain deliverables of our SK On agreement. But right now, we believe our revenue will come in pretty ratably over the year. With respect to liquidity, we expect '24 total cash investment to be in the range of $100 million to $120 million. Breaking this down, we expect operating cash investment to be in the range of $60 million to $70 million, including the $20 million carryover from '23. Our operational investment includes development of our A2 sample cells as well as higher volume production of our electrolyte and the development of our next-generation powder as well. In terms of timing, our cash investment will likely be pretty evenly spread over '24.

We expect '24 total CapEx to be in the range of $40 million to $50 million, which includes around $15 million carried over from '23 for the build-out of our powder development capabilities as well as equipment upgrades for materials handling and cell development. Overall, this CapEx spend is significantly lower than previous years when we were investing large amounts of cash into the construction of SP2 and the installation of our EV cell line. With that, I'll turn the call back to John.

John Van Scoter: Thanks, Kevin. 2023 was a milestone year for Solid Power, enabled by hard work and execution of the Solid Power team and the excellent collaboration we've had with our partners. As we enter 2024, we're acting with competitive urgency, the successes of 2023 have us well positioned to execute. I look forward to keeping you updated. With that, I will hand it over for Q&A.

See also 20 Countries With Worst Vision Problems and 18 of the Easiest Languages for English Speakers to Learn.

To continue reading the Q&A session, please click here.